NEWS CENTER

Zhongrui heavy industry ZJD2000/100 crawler reverse circulation rock drill was sent to Ji'an, Jiangxi to help local urban traffic construction!

2020/06/30

At the end of June 2020, the ZJD2000/100 crawler reverse-circulation rock drill ordered by a Jiangxi customer was successfully loaded and sent to the construction site of the Ji’antai and Yanxi Integrated Freight Wharf project in Jiangxi. The project has a pile diameter of 1 to 1.2 meters and a pile length of 25. About 13 meters into the strong and moderately weathered red sandstone. After the equipment arrived at the project construction site, the after-sales service engineer of Zhongrui Heavy Industry rushed to the site in time to complete the equipment installation and commissioning. At present, the equipment has entered the normal construction state.

It is understood that this project is one of the key projects of Ji'an City's transportation construction. After completion, it will become a comprehensive logistics center with modern logistics functions in the central part of Ji'an. It will play a huge role in the construction of the Ji'an Corridor and the economic development of the hinterland.

15953882622729.jpg

15953881711406.jpg